March 18, 2008

Road upgrading in Dagupan over before rainy season y

THE Second Highway Engineering District has assured the public that the ongoing upgrading of a 650-meter portion of the Dagupan-Binmaley-Lingayen Road in barangay Tapuac here will be completed before the rainy season.

Rodolfo Dion, second highway district engineer, said that flood-prone portion of the road is now being elevated by .70 meter.

Costing P20 million, the project is expected to be finished before the city’s Bangus Festival slated sometime in April this year, he said.

The Bangus Festival is expected to draw a banner crowd that will come not only from Pangasinan but also from the whole region.

A drainage system was constructed ahead of the elevation work on the road way.

With the construction work now in full-blast, the roadway has been declared for one-way traffic yet till March 15 when it will be totally closed.

Filed under News, Provincial News by The Pangasinan Star.
Permalink • Print • 

Track this entry:

Trackback url

Leave a comment

Powered by: Philippine Web Host Provider and the Semiologic CMS | Design by Mesoconcepts | Directory of Commentary Blogs